Title: Butane Installation

Project: New Butane System / Truck Loading

Location: Austell, GA

Cost:  $7.1 Million

Discipline: Full Service, Mechanical, Civil, Electrical & Coatings

PROJECT DETAILS

The new Butane System included the fabrication and installation of 24,000 feet of 1/2" to 12" piping, (9) can pumps, (3) vaporizer skids, meter prover and (2) blending skids and (6) truck offload skids. Including all required civil duties for pumps, piping and supports. Electrically, project power wiring was installed, including injector skids and MOV's. Cable tray and supports installed for wire runs including conduits required for power supply and instrumentation. All skids, piping, pumps and associated equipment were prepped and coated to specification. 

 