Project - Connector Piping & Manifolds
PROJECT INFO
Title: Connector Piping & Manifolds
Project: Hartford Connector Piping
Location: Hartford, Illinois
Cost: $3.2 Million
Discipline: Full-Service Project involving Mechanical, Structural Steel, Electrical and Protective Coatings
PROJECT DETAILS
This Connector project in Hartford, IL consisted of all XL disciplines for a complete project fabrication and installation on a 60-hour week. Consisting of piping sizes from 8” to 24” piping. Including prover loops, meter runs, sump lines, suction lines, discharge lines, recirculating lines, HPV & LPV, reliefs, drains and instrumentation required. New booster pumps offloaded and installed, excavate and pour new pump pads and pipe and cable tray supports and a PDC building set in place with required connections.
Fabricate and install direct buried PVC coated conduits and AG cable trays. MOV power supply. 480V supply to skids, new I/O panel at the switch rack. Newly installed Fiber Optic cable and remote I/O panel and grounding rings. All piping, valves, steel supports were grit blasted, then coated with a three-coat protective painting system specified by the owner.